ERP terminology, explained in plain language.
The concepts you'll meet when evaluating and deploying an operations platform — one short definition each, with the Apus module where the concept lives.
Finance & Control
- GL — General Ledger
The central book every journal entry lands in; the financial statements are all built from it, so an error in the GL is an error everywhere.
See the module- AP / AR — Accounts Payable / Receivable
Two flows of money running in opposite directions: AP is what you owe suppliers, AR is what customers owe you.
See the module- FA — Fixed Assets
Tracks acquisition cost, depreciation and transfers of assets; unlike EAM's physical asset register, FA looks at value.
See the module- Standard costing
Costing against a pre-set standard and analysing the variance against actuals, instead of waiting for period end to find out.
See the module- Reconciliation
Matching figures between two sources — the books against the bank statement, the warehouse against accounting. This is what eats most of the close.
See the module- Multi-ledger
One posting produces several parallel sets of books (say IFRS and the local standard) without anything being entered twice.
See the module- Accounting period & close
The time unit you lock figures against. Once a period is closed, a new entry goes to the next one or through an adjustment that leaves a trail.
- FI — Financial Accounting
The external, statutory accounting layer: general ledger, receivables/payables, fixed assets, tax and period close.
See the module- CO — Controlling (Management Accounting)
The internal accounting layer that serves management: cost centers, profit centers, product costing, budgets and profitability analysis.
See the module- Cost center / Profit center
The unit that collects costs and the unit that measures profit — the foundation of every management report by department, plant or product line.
See the module- Internal order
A code that collects costs for a time-boxed effort — a campaign, an R&D run, an event — so it can be settled and allocated to the right place.
See the module- Consolidation
Rolling up the reports of multiple legal entities into one picture, eliminating intercompany transactions within the group.
See the module- Revenue Recognition
The principle of recording revenue as performance obligations are fulfilled — critical for service contracts and long-running projects.
See the module- IFRS / local GAAP
International and local accounting standards. Companies with foreign ownership often have to report under both in parallel.
See the module- CLM — Contract Lifecycle Management
Managing a contract end to end: drafting from a clause library, signing routes, obligations and renewal dates.
See the module
Supply & Manufacturing
- Lead time
The total time from placing an order to having the goods in hand. Underestimating it is the most common cause of a stockout.
- Safety stock
The buffer held against demand swings and late deliveries. Set it high and cash is tied up; set it low and the line runs dry.
- ATP — Available to Promise
What you can genuinely promise a customer for a given date, once the quantities already committed to other orders are subtracted.
See the module- Batch / Serial
Two ways of identifying goods: a batch for things made in runs, a serial number for each individual unit. The basis of all traceability.
See the module- WIP — Work in Progress
The value sitting half-finished on the line. Growing WIP is usually the signature of a bottleneck.
See the module- Routing
The sequence of operations and standard times needed to make a product; together with the BOM it is enough to release a production order.
See the module- Cycle counting
Counting part of the warehouse on a rolling schedule instead of shutting down to count everything; keeps stock accuracy without stopping operations.
See the module- EAM — Enterprise Asset Management
The life of physical assets: preventive maintenance, work orders, spare parts. EAM looks at the machine, FA looks at its value.
See the module- QMS — Quality Management
Inspection standards, inspection records, complaints and CAPA — tied back to the exact lot, machine and shift that produced the problem.
See the module- P2P — Procure-to-Pay
The chain from purchase request and approval, through the order and goods receipt, to the invoice and payment, with three-way matching.
See the module- S&OP — Sales & Operations Planning
The cycle that balances the sales plan against supply and manufacturing capacity, typically on a monthly cadence.
See the module- MRP — Material Requirements Planning
Computes material requirements from the production plan: what is needed, how much, and by when.
See the module- DRP — Distribution Requirements Planning
MRP for the distribution network: replenishing stock for each warehouse or point of sale based on demand forecasts.
See the module- BOM — Bill of Materials (EBOM/MBOM)
A product's material recipe. The EBOM reflects the design structure; the MBOM reflects how the factory actually assembles it.
See the module- MES — Manufacturing Execution System
The shop-floor execution layer: work orders, scheduling and real-time shop-floor data.
See the module- PDM/ECO — Product Data & Engineering Change
Managing design versions and approved engineering changes (ECR/ECO) — the link between R&D and manufacturing.
See the module- OEE — Overall Equipment Effectiveness
The composite equipment performance index = availability × performance × quality. The factory's standard yardstick.
See the module- FEFO — First Expired, First Out
Issuing stock by nearest expiry date first — mandatory for food, pharma and cosmetics.
See the module- CAPA — Corrective & Preventive Action
The nonconformance-handling process: corrective action for what already happened, preventive action for what's about to.
See the module- Traceability
The ability to follow a lot or serial number across the whole chain — from incoming materials to the product in the customer's hands.
See the module
Customer & Revenue
- Lead / Opportunity
A lead is a contact whose need is still unqualified; an opportunity has cleared the bar to enter the revenue forecast.
See the module- Pipeline & forecast
The set of opportunities by stage, used to forecast next period's revenue instead of guessing by feel.
See the module- Price list & discount policy
The rules that decide the selling price by customer, channel, quantity and timing — the most common place for margin to leak away.
- Trade promotion
A promotion run through the distribution channel; its cost has to be tied back to the right revenue to see which campaign actually paid.
See the module- Visits & sales routes
The rep's call schedule across outlets; the raw data behind any measure of coverage.
See the module- CRM — Customer Relationship Management
Managing leads, sales opportunities and the customer journey from first contact through after-sales care.
See the module- DMS — Distribution Management System
Managing the distribution channel: distributors, sales routes, route orders and stock, promotions.
See the module- MQL / SQL — Qualified lead
A lead judged ready to pursue, either by marketing (MQL) or by sales (SQL).
See the module
People & Projects
- HRM — Human Resource Management
Records, contracts, time, payroll and the whole employee lifecycle on a single personnel file.
See the module- Time & attendance / payroll
Hours worked flow straight into the payroll run and into project cost, instead of living in three separate spreadsheets.
- Earned Value (EV)
Measuring progress by the value actually completed, so you know a project is late or over budget before it ends.
See the module- Resource leveling
Rescheduling when the same person has been committed to several jobs at the same time.
See the module- PM/PPM — Project, Program & Portfolio
Three management levels: a project (one deliverable) → a program (several projects sharing a goal) → a portfolio (all investments, prioritized by strategy).
See the module- WBS — Work Breakdown Structure
The project's work decomposition tree — the unit for assigning work, measuring progress and collecting costs.
See the module- Baseline
The frozen plan (scope, schedule, budget) used as the benchmark once the project is actually running.
See the module- Stage-gate
An approval gate between project phases — resources for the next phase are only committed once the gate is passed.
See the module- OKR — Objectives & Key Results
A goal-setting framework: one qualitative objective paired with measurable key results.
See the module- BSC — Balanced Scorecard
A strategy map balancing four perspectives: financial, customer, process, and learning & growth.
See the module
Knowledge & Digital Operations
- RBAC — Role-Based Access Control
Give rights to roles and put people into roles, rather than granting rights person by person — the only approach that stays controllable at scale.
- SSO — Single Sign-On
One identity across many systems; revoke it once and every door closes.
- Audit trail
The log of who changed what, when, and the value before and after. The first thing an auditor asks for.
- Workflow / BPM
Approval and handling flows modelled as rules, instead of living in email threads and habit.
- RAG — Retrieval-Augmented Generation
The technique that lets AI read your own data and answer with its sources, instead of answering from the model's memory.
- EDM — Electronic Document Management
Managing electronic documents: storage, permissions, versions, approval flows and e-signature.
See the module- BI — Business Intelligence
The analytics layer: dashboards, alerts and forecasting on real-time operational data.
See the module- E-office — Digital administration
Digitized internal administration: inbound/outbound correspondence, approval routing, meeting-room booking, electronic forms.
Platform & Operations
- Fit-check
The pre-contract review that establishes whether the standard package really covers your operation; its outcome decides scope and price.
- Go-live
The day the new system starts running for real. Before it comes the parallel run; after it comes stabilization.
- Parallel run
Running the new system alongside the old way of working for a full cycle, so the figures can be compared before the old system is retired.
- Data migration
Moving master data and opening balances over from the old system. The quality of the source data drives most of the project risk.
- UAT — User Acceptance Testing
Real users running real scenarios to confirm the system does the job — not the project team signing off on its own work.
- TCO — Total Cost of Ownership
The full lifetime cost: implementation, use, maintenance, upgrades and the cost of leaving — not just the opening price.
- Lock-in — vendor lock-in
The state where leaving costs so much that you stay. Owning your data and your source code is how you reduce it.
- ERP — Enterprise Resource Planning
An enterprise resource planning system — business modules sharing one data layer.
- Tenant
A customer's private data space on the platform — fully isolated from every other customer.
- Master data
The shared reference data of the whole system: customers, suppliers, materials, accounts — entered once, used by every module.
- SLA — Service Level Agreement
Contractual service commitments: uptime, and response times by incident severity.
- RTO / RPO
Two post-incident recovery objectives: RTO is the maximum time until service runs again; RPO is the maximum amount of data that may be lost.
- Cutover
The moment of switching from the old system to the new one, within a transition window agreed in advance.
Want to see these concepts running for real?
Book a demo for your industry — the Apus team presents with data, not with jargon.